Update progress

Wednesday, September 17, 2014 0 Comments

The update operation is the responsible of downloading files and directories from the repository into your workspace. It can be a time consuming action if there’s a high number of files to be downloaded (or updated) or if the overall size is big. The equivalent to “update” in Plastic is “checkout” in SVN and Git jargon.

We added a new “update progress” so that when there’s a lot to be downloaded you get more precise feedback:

The progress is updated in 4Mb blocks which is the transfer unit we use. It can be a chunk of a big file or a group of small files summing up to 4Mb.

Availability

This feature is only available in version 5.4 (5.4.13.578 - Jun 26th 2014 and higher). 5.0 won’t get this one merged since the code is built on top of some other changes and improvements developed for 5.4 only.

We develop Plastic SCM, a version control that excels in branching and merging, can deal with huge projects and big binary assets natively, and it comes with GUIs and tools to make everything simpler.

If you want to give it a try, download it from here.

We are also the developers of SemanticMerge, and the gmaster Git client.

0 comentarios: